| 5/30 San Quintin Launch Ramp Construction w/ Pics
The public concrete launch ramp is being extended into the bay another 11 meters or so. They are using pre-cast panels and laying them in place. Not sure how they will be secured or the longevity of them. It is interesting and they claim they have used them before. We have been using the mud ramp adjacent to it for many years as there is a severe drop-off at the end of the existing ramp due to the tide changes in the bay. The government is paying for this project according to a sign on the road in. They are also putting in pilings that appear to be for floating docks at the Old Mill. These pictures were taken at a -1.3 tide.
Stan
|